Österreichisches Parlament
Listed and hard-to-access areas fully documented.
Read the success storyRefurbishment planned on the digital twin instead of legacy drawings.

1
valid basis instead of three data states
DIN 277
area schedule from the model
An administrative building was to be refurbished. The available records came from several decades and several design offices.
Which figure applied could not be decided. Areas from the lease, dimensions from the construction drawing and the on-site condition disagreed in several places.
It started with the strategy phase. We clarified which level of information need the refurbishment planning actually requires, and which component groups manage without LOIN 400.
Capture ran terrestrially with georeferencing. The as-built model with area schedule was derived from the point cloud.
The deviations between legacy drawing and as-is condition are documented. Where a figure changed, the reason is traceable.
The refurbishment planning runs on the digital twin.
The twin remains in use after the refurbishment as an operational basis.
We no longer debate dimensions. We debate the design.
Approach, figures and outcome in detail. Five fields, then the PDF is in your inbox.
Tell us what you are working on. We show you what a reliable digital basis for your site looks like.