Turning Buildings into Digital Twins.

Reality capture. BIM modelling. Digital twins. Spatial intelligence. One partner connecting it all into building intelligence.

Over 20.000.000 m² of building stock captured.200 projects.

  • IKEA
  • voestalpine
  • TGW Logistics Group
  • Energie AG Oberösterreich
  • Republik Österreich Parlament
  • Drees & Sommer
  • ArcelorMittal
  • HABAU
  • DPR Construction
  • ARE Austrian Real Estate
  • ASFINAG
  • Heinle Elektroanlagen
  • G. Klampfer Elektroanlagen
  • BIG Bundesimmobiliengesellschaft
  • Burghauptmannschaft Österreich

A building you do not know is a building you cannot plan.

Floor areas, load-bearing structure, pipe routing, plant equipment, clearances. That information exists in most companies. It sits in a drawing set from 2011, in a folder on a server, and in the head of a technician who retires next year.

Every refit, every expansion and every maintenance decision starts from that material. When it no longer matches the building, the cost shows up later: on site, in change orders, in delays.

qapture captures the building exactly as it stands today and turns it into a digital twin. One current source, accessible to construction, engineering, facility management and leadership at the same time.

Most buildings are managed on assumptions.

Yours don’t have to be

02 The path

Turn buildings into data.And data into smarter decisions.

Every project starts somewhere else. Some companies are still working out what a digital twin delivers for them. Others run 40 sites without a single data model. qapture joins you where you stand.

  1. 01

    Discover

    We establish what a digital twin delivers for your organisation before anyone unpacks a scanner.

    You receive:

    • Discovery workshop
    • Use case assessment
    • ROI calculation
    • BIM strategy
    • Employer information requirements and BIM execution plan
    • Internal roadmap
  2. 02

    Capture

    We record the building as it stands, while production, patients or shifts continue.

    You receive:

    • Georeferenced point cloud
    • 360° imagery
    • Geodetic survey control
    • Mesh
    • Gaussian splatting
    • Drone capture of building envelopes
  3. 03

    Structure

    We turn measurement data into a model your systems and your planners can work with.

    You receive:

    • BIM model to agreed LOIN
    • 2D drawings derived from the model
    • Comparison against existing drawing sets
    • Clash detection
    • BIM field control on site
    • IFC and native format handover
  4. 04

    Activate

    We put the twin into daily use and keep it current.

    You receive:

    • Browser-based web viewer
    • Access for distributed teams
    • Documents attached to objects
    • Live data integration
    • ISO 27001 hosting
    • Scheduled updates
    • Training through the qapture aqademy
  5. 05

    Scale

    We put AI models to work on the data foundation built in stages one to four.

    You receive:

    • Object detection
    • AI OCR
    • An AI agent for building data
    • Automated scan-to-BIM
    • A facility manager dashboard
    • Smart re-scan triggers

04 The cycle

One model carriesthe whole lifecycle.

Plan, build, operate, change: in most projects each of these phases starts with a fresh survey. With a digital twin the same data runs through. Every phase gives back what the next one needs.

Capture the as-is and test options before building.

To the use cases
PlanBuildOperateChangeDigital twinPlanone data basis
We expect a lot from our partners. And qapture has earned our trust. Their virtual twin services empower us to plan more intelligently, make faster decisions and reduce the need for on-site presence, saving time, energy and resources.
Senior Project ManagerGermany’s largest aviation company
  • 20 million m²

    of building stock captured by qapture to date.

  • 350,000 m²

    digital twin at a single site, captured in full operation.

  • 37,000 m²

    captured in one day, without stopping operations for it.

  • ISO 27001

    certified hosting for all data held with us.

06 Spatial intelligence

Blind spots?Not on our watch.

Your building already knows the answer. You just have to ask.

After capture and structuring, you hold more than a 3D model. You hold an AI-ready data foundation of the entire site.

AI models detect objects on it, read equipment labels, answer questions in natural language and flag changes. Without a new capture. Without manual data preparation.

These functions run on data qapture has already captured, which removes the second survey and the separate data preparation project.

Meet qentin
Sample building

How many fire extinguishers are in this building?

I found 24 fire extinguishers, all detected automatically.

Stop digging
through building data.

Just
ask it.

We don’t deliver scans and disappear. We stay.

Most providers finish at handover. qapture builds the data foundation and keeps working on it, through construction, into operation and into everything that runs on top of it.

  • Strategy first. Technology second.

    Every engagement starts with your goals and your maturity level. Then we pick the right mix of scanning, BIM and twin operations.

  • Fast, without shutdown.

    We capture during operation. Production keeps running, the shift continues.

  • Data you can actually use.

    Cleanly structured, standardised across every site and AI-ready from day one.

Knowledge you can put to work today.

We do not hold knowledge back. People who understand what building digitisation delivers ask better questions and make better decisions.

Template · PDF

BIM specification sheet

For engineering offices, architects and project managers who put BIM work out to tender. Ready to use, so bids stay comparable and the model carries the data operations will need.

Download

Whitepaper · seven projects · free

What precise as-is data does to planning

Seven real scan-to-BIM projects across four industries, from the first capture to the finished model at a defined level of information need.

Download

Case study · EUR 250 million build

Digital construction control at the Heart Center Bonn

25,000 m² under construction, over 10,000 documented deviations and 50 % fewer site visits. How the comparison of scan against model works on a site that cannot stop.

Download

What is a digital twin of a building?

A digital representation of the real building, maintained across its entire life cycle. It consists of the georeferenced capture, the structured BIM model and the data added during operation. The difference from a 3D model lies in currency and structure: a digital twin is maintained and can be queried.

What is the difference between a point cloud and a BIM model?

The point cloud is the measurement. Millions of points with coordinates, without meaning. The BIM model is the interpretation. A wall is recognised as a wall and carries build-up, material and properties. For evidence you need the point cloud, for design and operation the model. That is why we deliver both.

What does scan-to-BIM mean?

The path from capture to structured model. Capture, register, georeference, model, verify.

What does digitising a building cost?

Price depends on three variables: area, level of information need and plant density. An open logistics hall at LOIN 200 costs far less per square metre than a plant floor at LOIN 400. That is why we clarify the LOIN before quoting. For a reliable figure we need asset type, area, location and your use case.

How long does a project take?

Capturing an 8,000 m² office building takes one to two days. Point cloud and panoramas sit in the viewer after about a week, the BIM model after three to five weeks. For plants and distribution centres, plan in weeks rather than months, depending on area.

There’s a building we haven’t scanned yet. Poor thing.

Tell us what you are working on. We will show you what a reliable digital foundation looks like for your site and what the first step costs.