01 Discover

A BIM strategy that lands inside your company.

We clarify what a digital twin delivers for your site, what it costs and in which order to proceed. The result is a roadmap your stakeholders support.

Floor plan from the as-is model, one complete storey

Who it is for

  • For owners who tender BIM and need comparable bids.
  • For groups with 40+ sites and no consistent data model.
  • For teams who need to justify a decision internally.

What you get

  • Discovery workshop with your technical and operations teams, one day
  • ROI assessment per use case, calculated on your areas and processes
  • BIM strategy with level of information need per use case
  • Employer information requirements (EIR) and BIM execution plan (BEP)
  • Internal roadmap with sequence, ownership and budget frame
  • Decision paper for management and procurement
  1. 01

    Review what exists

    We look at what you have. Drawings, CAD data, CAFM systems, maintenance contracts. Usually there is more than expected and less of it current.

  2. 02

    Prioritise use cases

    We collect the questions your operation cannot answer today. Each question becomes a use case, each use case gets a value.

  3. 03

    Define the level of information need

    Not every component needs LOIN 400. The LOIN combines the LOG (geometry) and the LOI (information): we define per component group which geometry and which properties the model carries. That saves time and budget.

  4. 04

    Roadmap and pilot

    We scope a pilot standard that delivers a result in eight to twelve weeks. The rollout follows what the pilot proves.

Most buildings are managed on assumptions.

Yours doesn’t have to be.

The strategy describes formats and interfaces, not products. IFC stays the handover language, your native format stays your working format. Where a CAFM or ERP system is in place, we plan the connection with it.

At Energie AG Oberösterreich a refurbishment was planned without a reliable basis. The strategy phase produced the digital twin the planning runs on today.

Template · PDF

BIM specification sheet

The template you use to define your BIM requirements cleanly, before the first enquiry goes out.

We use your details solely to process your request. See the privacy notice for details.

What does a discovery workshop cost?

The workshop runs as a day rate. The amount is credited against a subsequent engagement. We state the concrete frame in the first call because it depends on site size and number of participants.

Do we need a strategy for a single building?

For one building a short two-hour clarification is often enough. We define which data you need and then start capture directly.

What is the difference between EIR and BEP?

The EIR describes what information the client needs. The BEP describes how the project parties deliver it. The EIR comes from you, the BEP from those executing. We write both documents so they fit together.

Most buildings run on outdated data. Yours does not have to.

Tell us what you are working on. We show you what a reliable digital basis for your site looks like.