Set apart

Mission critical. No downtime scheduled.

Hospitals, data centres and aviation infrastructure. Environments with high plant density, hard compliance requirements and an operation that does not pause.

In a hospital, a data centre and a maintenance hangar the same sentence applies: a data error costs more than a delay.

These buildings have the densest plant and the strictest requirements. At the same time there is no window in which everything stands still.

Anyone planning here cannot rely on record drawings. The basis has to be right before the first cut.

What qapture delivers.

  • Capture in full operation

    We work in the windows operations define. In hospitals that means night hours and non-surgical times, in a data centre escorted access into the white space.

  • Plant density as the normal case

    Technical floors, service risers, redundancy paths. We model to the level of information need maintenance and approvals require.

  • Construction-accompanying documentation

    We capture at intervals while the ceiling is open. Afterwards what sits behind the cladding is documented. At University Hospital Bonn for the first time in the hospital’s history.

  • Compliance you can evidence

    Escape routes, fire compartments, suppression systems and signage sit located in the model. Evidence is a query, not a walk-through.

350,000 m²

of captured area at Germany’s largest aviation company. 22 buildings, six delivered BIM models.

Precision changes everything.

Reduce costly mistakes before they happen.

Spatial intelligence in critical infrastructure

Server room as a point cloud, rack rows captured

Object detection finds fire extinguishers, escape route signs and sockets automatically in the 360° imagery and locates them in the 3D viewer. Compliance audits run without manual counting.

AI OCR reads asset tags across the whole site. In a maintenance hangar with over 100 captured machines, every asset ID is searchable.

We now have a basis both planning and maintenance can rely on. That was not the case before.
Senior Project Manager Germany’s largest aviation company

More projects from the same industry

  1. 01

    Permits and safety

    Access permits, escort requirements and restricted zones are documented before a single device reaches the site.

  2. 02

    Capture section by section

    We work in areas operations can release. Each section is delivered complete.

  3. 03

    Continue alongside construction

    During the construction phase BIM field control runs. On completion there is an as-built model operations adopt.

Are you allowed to scan in a white space?

With escorted access and agreed equipment, yes. We work without tripods in circulation routes and without touching cooling or power distribution. The procedure is approved with the operator in advance.

How do you handle patient data?

We capture in patient-free times and areas. People in imagery are automatically blurred; areas with confidentiality requirements are captured without imagery.

What is construction-accompanying documentation?

Capture runs at intervals during construction while ceilings and shafts are open. Afterwards what sits behind the cladding is documented. That information cannot be recovered later.

Most buildings run on outdated data. Yours does not have to.

Tell us what you are working on. We show you what a reliable digital basis for your site looks like.