One digital twin. Nine situations where it counts.
Every project starts with a concrete question: how do we refurbish without disrupting operations? How do we evidence the condition of our portfolio? How do we keep track of 40 sites? qapture answers each of them from the same data.
Nine use cases
Building in existing fabric
Refurbishment or extension, planned on a basis that still matches reality.
ESG reporting & refurbishment
Evidence the condition, plan the works, document the progress.
Operations & maintenance
FM teams work from the current condition, not from a drawing set that is ten years old.
Portfolio comparability
One data standard across every asset, for investment decisions that hold up.
Store network & site rollout
One process for many sites, without anyone travelling to each of them.
Quality assurance on site
Deviations between drawing and execution show up before they cost money.
Industrial asset documentation
Retrofit and extension in full operation, on asset documentation that holds.
Digital construction control
Evidence of progress instead of descriptions — as-designed and as-built in one model.
Factory layouting
Plan halls, plant and routes on the digital twin before anything is moved.
Every use case, the same route.
Refurbishment, rollout or asset documentation: every use case runs through the same five stages, from the first survey to daily operation. The difference is not the route, but where a project joins it and what is needed at the end.
Which situation are you in right now?
Tell us what you are working on. In 30 minutes we will say whether and how we fit.