03 Structure

One model. All trades. No surprises.

We merge the discipline models, verify them against reality and take the comparison to site. Clashes surface in the model, not in a variation order.

Measurement on site, values recorded straight into the model

Who it is for

  • For owners refurbishing existing buildings who want no more variations.
  • For project leads coordinating three consultants and one model.
  • For operators who need the construction sequence documented.

What you get

  • Coordination model from all discipline models, updated weekly
  • Clash detection with a prioritised list and ownership per conflict
  • BIM field control: as-planned to as-built comparison on site
  • Digital site diary with located construction progress
  • Issues located in the model, with due date and owner
  • Handover model for operation, verified as-built version
  1. 01

    Set the rules

    We define model structure, naming convention and check rules before the first consultant delivers. Without that step we later compare apples with pears.

  2. 02

    Merge and check

    Every delivery runs through the check routine. Geometry against point cloud, attributes against the EIR, trades against each other. The result is a list with names, not with guesses.

  3. 03

    Field control

    We capture the construction state at intervals and overlay it on the model. Deviations become visible while they are still cheap to correct.

  4. 04

    Prepare handover

    At the end there is an as-built model operations can adopt. Not the design version with change lists attached.

Precision changes everything.

Reduce costly mistakes before they happen.

Clash detection with Solibri and Navisworks, issue management via BCF so every report lands in the consultant’s own tool. Field control runs with mobile mapping at short intervals. All check rules are open and auditable.

On the FRA1 Mainz data centre project, BIM field control ran across the entire construction phase. Deviations were captured at intervals before they became variations.

Template · PDF

BIM specification sheet

The template you use to define your BIM requirements cleanly, before the first enquiry goes out.

We use your details solely to process your request. See the privacy notice for details.

Do you take on overall BIM coordination?

Yes. We act as overall BIM coordination on the client side or as discipline coordination for individual trades. In both roles we deliver the check reports, not just the meetings.

What is BIM field control?

The ongoing comparison between model and site. We capture the as-built state at intervals, overlay it on the design and show deviations with location and dimension. It is the cheapest variation prevention available.

How often is the coordination model updated?

Weekly in the intense phase, every two weeks in quieter periods. The cadence is set in the BEP and is not changed by feel.

Most buildings run on outdated data. Yours does not have to.

Tell us what you are working on. We show you what a reliable digital basis for your site looks like.